m

Special Project Process Manual

Director Development Control (DDC) accesses the Electronic Construction Permitting System Portal using the URL https://ecps.gov.bd and then clicking “Login” button. Then DDC will login to the system using his/her username and password. Director Development Control (DDC) receives the application when the Front desk assistant accepts the application. Director Development Control will find the application in the Incoming section. Incoming files are sorted from Recent to Oldest. DDC will have to click on the Application he wants to proceed with. As shown in Figure 1.

Figure 1

A new pop-up window will appear when DDC clicks on any incoming application. DDC will have access to five different tabs Assignments, Staff Reviews, Attachments, Applicants’ Clarifications, and History.  DDC will check all the available information of the application.  DDC can check the applicant’s details information by clicking on the Applicant name link as shown in Figure 2.

Figure 2

After clicking on the link a pop-up will show up containing the applicant’s details. DDC user can close it by clicking on the “Close” button as shown in Figure 3.

Figure 3

DDC can click on the project link to see the details of the main project as shown in Figure 4.

Figure 4

Read more…

Help